Chelsea State Bank ad

Aug. 27: Border to Border Trail segment ribbon cutting

Courtesy photo. A scene from the Border to Border Trail.

On Aug. 27, Huron Waterloo Pathways Initiative (HWPI) in partnership with the Washtenaw County Parks and Recreation Commission (WCPARC) will celebrate the opening of a new segment of the Border-to-Border Trail (B2B).

The 2.1 mile trail segment of the Chelsea-Dexter connector begins at Freer Road and continues to Lima Center Road, showcasing ​stunning stretches of Michigan fields, an iron bridge over Mill Creek, and a connection to the Chelsea Ridge neighborhood. ​

This trail segment is a paved, 10-foot wide, ADA (Americans with Disabilities Act) compliant, non-motorized pathway intended for people of all ages and abilities.

A ribbon cutting ceremony will be held at 4 p.m. to mark the official opening of the first miles of the Dexter-Chelsea connector. ​The event will take place on the Freer Road end of the trail by the Oak Grove East Cemetery.

Parking will be available in the lot of the Church of Jesus Christ of Latter-Day Saints at 1330 N. Freer Road.

This event is open to all.

For more information, please visit the HWPI newspage at: ​http://huron-waterloo-pathways.org/news/.

Progress on the B2B continues in other areas throughout the county. Bridge work and boardwalk construction are underway on the 1.2 mile trail segment of the B2B that travels along the Huron River from the Dexter-Huron Metropark to Zeeb Road.

There is substantial activity in the M-52 corridor, with the start of construction on a 2.1 mile trail segment from Green Lake to North Territorial Road, a tunnel under M52 and a B2B trailhead. And there is another half mile of construction along Grove Road in Ypsilanti. 

Print Friendly, PDF & Email

1 thought on “Aug. 27: Border to Border Trail segment ribbon cutting”

Comments are closed.

More News

Counting down to fair: a look back to 1950-1959

August 11, 2012

SRSLY needs adult help to continue its cinema program

August 11, 2012

Arctic Chill: A really cool summer camp at Arctic Coliseum

August 11, 2012

New Chelsea Market may open in temporary space Friday, Aug. 10

August 10, 2012

At the Farmers’ Market: Aug. 11

August 10, 2012

Purple Rose Theatre hosting BBQ fundraiser and silent auction Saturday

August 10, 2012

Chelsea Antiques Mall to hold last outdoor event Saturday

August 10, 2012

Chelsea resident plans business expansion, informational event

August 10, 2012

Counting down to fair: 1937-1949 (with photos from 2011)

August 10, 2012

AnnArbor.com reports: Dexter area man killed in car crash in Dexter Township

August 9, 2012

‘Paint Chelsea Pink’ meeting planned for Friday, Aug. 10

August 9, 2012

Keep an eye on the weather, ‘Avatar’ showing may be cancelled

August 9, 2012

Letter to the Editor

August 9, 2012

Counting down to fair: Meet four of the fair queen contestants

August 9, 2012

New aerial truck arrives at Chelsea Area Fire Authority station

August 9, 2012

Brick by brick: Veterans Park pathway adds 12 new names

August 8, 2012

Counting down to fair: 1891-1899 (with photos from last year)

August 8, 2012

Dexter, Lima, Lyndon and Sylvan township election results

August 8, 2012

Chelsea Police: three smash and grab thefts in parking lots in last two days

August 7, 2012

Counting down to fair: A look back at its history and last year’s parade

August 7, 2012

Flags at half-staff to honor victims of Wisconsin shooting

August 7, 2012